Purpose

To identify and control electrical, struck-by, caught-between, fall, and equipment hazards when employees, tools, materials, vehicles, cranes, aerial lifts, or other equipment may work or travel near overhead electric power lines.

Scope

This JSA applies to employees and subcontractors performing construction, maintenance, material handling, lifting, excavation, access, or equipment operations where overhead power lines could be contacted or approached. Only qualified electrical workers may perform work on or within restricted electrical approach areas as permitted by applicable regulations.

Responsibilities

Supervisor / Competent Person

  • Inspect the work area before work begins and identify all overhead power lines that could affect the work.
  • Determine the line voltage through the utility owner/operator when clearance depends on voltage; do not guess.
  • Establish the work zone, required minimum clearance, barricades/warning lines, equipment limitations, and spotter requirements.
  • Conduct and document a pre-job briefing/JSA review with affected employees and stop work when conditions change or controls cannot be maintained.

Employees / Equipment Operators

  • Follow the established clearance distances, barricades, spotter signals, and equipment operating limits.
  • Treat overhead power lines as energized and uninsulated unless the utility owner/operator confirms otherwise.
  • Immediately stop work and notify the supervisor if the line location, voltage, clearance, weather, equipment configuration, or work scope changes.

Required PPE and Equipment

Minimum PPE shall be based on the site hazard assessment and task. Typical requirements include hard hat, safety glasses, high-visibility vest or garment, work gloves, safety-toe footwear, and task-specific fall protection where required. Electrical PPE does not authorize unqualified employees to approach energized lines.

Other required controls/equipment:

High-visibility barricades or warning lines; nonconductive tag lines when tag lines are used near power lines; dedicated spotter when required; reliable radio or hand-signal communication; and equipment range-limiting or warning devices when applicable.

Minimum Clearance Requirements

Before work begins, determine whether any person, tool, material, equipment component, load line, load, or rigging could enter the required clearance zone. For general construction work, employees shall not be permitted close enough to an electric power circuit that contact could occur unless the circuit is deenergized and grounded or effectively guarded. For cranes and derricks covered by 29 CFR 1926 Subpart CC, use the following Table A minimum clearances when the line voltage is known and the Table A option is selected.

Nominal Voltage (AC) Minimum Clearance
Up to 50 kV 10 ft
Over 50 to 200 kV 15 ft
Over 200 to 350 kV 20 ft
Over 350 to 500 kV 25 ft
Over 500 to 750 kV 35 ft
Over 750 to 1,000 kV 45 ft
Over 1,000 kV Established by utility owner/operator or qualified registered professional engineer

For crane/derrick operations up to 350 kV, OSHA also permits a 20-foot clearance option. For lines over 350 kV, special requirements apply; where OSHA specifies 20 feet, 50 feet is substituted for lines over 350 kV through 1,000 kV. Site or utility requirements that are more protective shall be followed.

Job Steps, Hazards, and Controls

Job Step Potential Hazards Required Safe Work Practices / Controls
1. Pre-job survey and planning Electrocution; arc flash/arc blast; unknown voltage; inadequate clearance; line contact. Survey the entire work zone before work starts. Identify overhead lines, poles, guy wires, transformers, and line sag. Determine whether equipment at maximum reach could enter the clearance zone. Contact the utility owner/operator for voltage information when needed. Assume lines are energized and uninsulated unless confirmed otherwise. Review this JSA with the crew.
2. Establish work zone and controls Unplanned entry into clearance zone; poor visibility; unauthorized access. Mark the safe working boundary with high-visibility barricades, warning lines, signs, or other effective means. For crane operations requiring encroachment precautions, place the elevated warning line/barricade at the applicable clearance distance. Restrict access to authorized personnel. Account for line sway, equipment movement, load swing, terrain, and wind.
3. Position vehicles and equipment Boom, mast, dump body, ladder, antenna, load, or raised component contacting a line; uneven ground; rollover. Use a spotter where required or where the operator cannot reliably judge clearance. Position equipment so maximum reach remains outside the clearance zone. Use range-limiting devices or proximity alarms when required/appropriate, but never rely on them as the sole protection unless permitted by the applicable standard. Maintain stable setup and observe manufacturer requirements.
4. Operate cranes, aerial lifts, excavators, dump trucks, or similar equipment Electrical contact; arcing; struck-by or crushed-by loads/equipment; inadvertent encroachment. Maintain the required clearance at all times. Keep booms, buckets, platforms, raised beds, load lines, rigging, and loads away from lines. Use a dedicated spotter in continuous communication when required. Stop movement immediately if clearance cannot be verified. Do not operate beneath a power line with cranes/derricks unless allowed by the applicable OSHA exception or the line is deenergized and visibly grounded.
5. Handle long or conductive materials Material bridging the clearance distance; loss of control; electrocution. Plan the travel path before lifting or carrying pipe, conduit, rebar, ladders, poles, siding, or other long materials. Keep materials horizontal and controlled where practicable. Do not raise conductive materials toward energized lines. Use nonconductive tag lines when tag lines are used near power lines.
6. Use ladders or access equipment Ladder/aerial lift contact with line; falls; electrical shock. Select access equipment that can be positioned and used without entering the required electrical clearance. Never move or raise a ladder where it could contact an overhead line. Maintain required fall protection and keep the work platform, tools, and materials within the established safe zone.
7. Travel under or near lines Raised boom/bed/mast contacting line; limited overhead clearance. Lower and secure booms, beds, masts, forks, attachments, and loads before travel. Use a designated travel route and spotter when needed. Verify clearance at the highest point of the vehicle/equipment and account for uneven ground and line sag. Follow crane-specific travel requirements when Subpart CC applies.
8. Weather or changing site conditions Wind-induced line/load movement; poor visibility; wet conditions; changed clearance. Reassess the JSA when wind, rain, lightning, darkness, grading, equipment setup, or work scope changes. Suspend work when required clearance cannot be reliably maintained.
9. Electrical contact/emergency Electrocution; step/touch potential; fire; secondary contact by rescuers. Operator should remain in the cab unless fire, explosion, or another emergency makes evacuation necessary. Warn everyone to stay away from the equipment and load; do not touch the equipment or attempt a rescue by direct contact. Contact emergency services and the utility. If evacuation is unavoidable, jump clear without simultaneously touching equipment and ground, land with feet together, and move away using small shuffling steps or hops. Do not resume work until the utility confirms the hazard is controlled.

Stop-Work Conditions

  • Required clearance cannot be maintained or accurately judged.
  • Line voltage is unknown when voltage-specific clearance is being used.
  • The designated spotter loses visual contact or communication with the operator.
  • Barricades, warning lines, alarms, limiting devices, or other required controls are missing or ineffective.
  • Weather, visibility, ground conditions, equipment configuration, or work scope changes create a new hazard.
  • Any employee, tool, load, or equipment enters or is likely to enter the prohibited clearance zone.

Training and Pre-Task Briefing

Affected employees shall be trained to recognize overhead-line hazards, required clearance distances, site controls, communication methods, and emergency procedures. Operators and dedicated spotters shall receive training appropriate to their assigned duties. The supervisor shall review the line location, voltage/assumptions, work zone, clearance boundary, spotter signals, equipment limits, emergency response, and stop-work authority before work begins.

References

  • OSHA 29 CFR 1926.416 – General Requirements, Electrical
  • OSHA 29 CFR 1926.1407–1926.1411 – Power Line Safety, Cranes and Derricks in Construction
  • OSHA 29 CFR 1926.1430 – Training Requirements, Cranes and Derricks in Construction