A Highway Construction Safety Manual provides the written safety policies, programs, responsibilities, and procedures needed to address the hazards associated with highway, roadway, paving, grading, bridge, drainage, and related heavy construction activities.
Highway and road construction employees may work within active traffic zones while operating or working around heavy equipment, paving machines, trucks, rollers, cranes, excavation equipment, and other machinery. Operations may also involve asphalt, concrete, underground utilities, excavation and trenching, silica exposure, noise, heat, night work, and constantly changing jobsite conditions.
An effective Highway Construction Safety Manual should therefore combine the company’s fundamental construction safety requirements with additional programs selected according to the road construction activities, equipment, materials, and hazards its employees encounter.
The contents of a Highway Construction Safety Manual should reflect the work the contractor actually performs.
A paving contractor may have different hazards than a contractor performing grading, drainage, bridge construction, excavation, utility installation, or traffic-control operations. Heavy highway contractors performing multiple types of civil construction may require a broader combination of safety programs.
The manual should begin with the company’s Core Construction Safety Programs and then include additional programs based on the company’s highway and road construction operations.
A comprehensive Highway Construction Safety Manual may include core programs addressing:
The manual should also establish responsibilities for management, supervisors, employees, competent and qualified persons, hazard identification, workplace inspections, safety training, hazard correction, incident reporting, recordkeeping, and periodic review of the company’s safety programs.
Traffic exposure is one of the defining hazards of highway and road construction.
Employees may work adjacent to moving vehicles while performing paving, excavation, grading, utility, concrete, inspection, maintenance, traffic-control, and other operations.
Traffic-control procedures should address applicable requirements for:
Traffic-control measures should reflect the roadway, traffic speed and volume, duration of work, work activity, equipment, pedestrian exposure, and other conditions affecting the project.
Employees should understand the traffic-control plan and remain within designated work areas whenever practical.
Flaggers may be required where traffic must be stopped, slowed, or directed through or around highway construction operations.
Flaggers should be appropriately trained and positioned where they can perform their duties without unnecessary exposure to traffic or construction equipment.
Flagger procedures should address:
Flaggers should remain alert to both public traffic and construction vehicles.
Employees exposed to public vehicular traffic or construction-equipment traffic should wear appropriate high-visibility garments as required by applicable standards and work-zone conditions.
Garments should be selected and maintained so employees remain readily visible during daytime, nighttime, low-light, and adverse-weather conditions.
Employees should not assume that high-visibility apparel alone protects them from vehicle or equipment hazards. Work-zone layout, traffic control, equipment procedures, employee positioning, and communication remain essential.
Highway construction frequently places employees on foot in close proximity to dump trucks, pavers, rollers, graders, loaders, excavators, skid-steer loaders, cranes, and other equipment.
Pedestrian employees should remain outside equipment operating zones whenever possible.
Work planning should consider:
Employees should avoid positioning themselves between moving equipment and fixed objects or entering equipment operating areas unless the operator is aware of their presence.
Highway and heavy construction may involve:
Safety procedures should address equipment inspection, operator authorization, seat belts, equipment stability, backing, blind spots, spotters, pedestrian exposure, attachments, travel routes, loading and unloading, maintenance, and safe parking.
Equipment should be operated according to manufacturer requirements and applicable safety standards.
Backing vehicles and equipment can create significant struck-by hazards on highway construction projects.
Where practical, work areas and internal traffic patterns should be arranged to reduce unnecessary backing.
When backing cannot be eliminated, controls may include:
Employees acting as spotters should remain visible to the operator and should not position themselves where they could be struck or caught between equipment.
Asphalt paving exposes employees to moving equipment, hot materials, traffic, heat, fumes, burns, noise, and caught-between or struck-by hazards.
Paving procedures should address:
Employees should remain clear of moving paving equipment and should use caution around hot asphalt, screeds, hoppers, conveyors, augers, and other hazardous equipment components.
Hot asphalt, tack coats, sealants, and other road-construction materials can create thermal, chemical, and inhalation hazards.
Employees should understand the hazards associated with the materials they use and follow applicable Hazard Communication requirements.
Protective measures may include:
Employees should be trained in appropriate response procedures for burns and other foreseeable exposures.
Rollers and compactors can create rollover, struck-by, caught-between, vibration, and visibility hazards.
Operators should inspect equipment before use and evaluate:
Seat belts should be used when required, and employees should remain clear of operating rollers and compactors.
Equipment should not be operated so close to an edge or unstable surface that rollover or collapse could occur.
Milling machines and other road-surface removal equipment may expose employees to moving machinery, traffic, silica-containing dust, noise, flying material, and struck-by hazards.
Safety procedures should address:
Employees should remain clear of cutting drums, conveyors, and other hazardous moving components.
Road construction activities may generate respirable crystalline silica when employees cut, drill, grind, crush, mill, jackhammer, or otherwise disturb concrete, masonry, asphalt, or other silica-containing materials.
Where applicable, silica procedures should address:
Controls should reflect the task, equipment, material, and applicable silica requirements.
Highway construction frequently involves excavation, grading, drainage, embankment, foundation, and other earthwork.
Where employees enter trenches or excavations, applicable excavation procedures should address:
Earthmoving operations should also consider slopes, unstable ground, equipment rollover hazards, overhead and underground utilities, dust, visibility, and interaction between equipment and employees on foot.
Before excavation, drilling, grading, or other ground-disturbing operations begin, existing underground installations should be identified as required.
Potential installations may include:
As work approaches the estimated location of an underground installation, its exact location should be determined using safe and acceptable means.
Existing installations should be protected, supported, or otherwise controlled as necessary during construction.
Highway contractors may perform concrete pavement, curb and gutter, barriers, drainage structures, foundations, bridge components, sidewalks, and other concrete work.
Potential hazards include:
Applicable Concrete and Masonry Safety procedures should reflect the actual operations performed.
Saw cutting, coring, drilling, and other concrete operations may expose employees to silica, flying particles, noise, electrical hazards, rotating equipment, and kickback.
Procedures should address:
Before cutting or drilling, the work area should be evaluated for utilities and other concealed hazards where applicable.
Highway and bridge projects may require cranes, boom trucks, excavators, hoists, and other lifting equipment to handle concrete structures, pipe, barriers, structural components, equipment, and materials.
Applicable procedures should address:
Employees should not work beneath suspended loads or place themselves between suspended loads and fixed objects.
Highway contractors performing bridge or elevated-structure work may encounter fall hazards, suspended loads, structural steel, concrete operations, scaffolds, aerial lifts, work over water, and public traffic.
Applicable programs may include:
Project-specific planning should address the actual bridge or structure being constructed, repaired, or maintained.
Highway construction can involve fall exposures at bridges, retaining walls, drainage structures, excavations, elevated platforms, formwork, structural components, and other locations.
Where fall-protection requirements apply, procedures should address the appropriate systems for the work being performed.
Potential controls may include:
Employees should be trained to recognize fall hazards and properly use the fall-protection systems required for their work.
Temporary barriers, signs, cones, drums, barricades, and other traffic-control devices should be installed and maintained according to the applicable traffic-control plan and requirements.
Employees installing, inspecting, repositioning, or removing traffic-control devices may themselves be exposed to traffic.
These activities should therefore be planned to minimize employee exposure and provide appropriate protection during setup and removal.
Damaged, displaced, or ineffective traffic-control devices should be corrected promptly.
Highway construction is frequently performed at night or during periods of reduced visibility to minimize disruption to traffic.
Night work may increase hazards associated with:
Adequate illumination should be provided for employees to safely perform their work without creating unnecessary glare or visibility problems for workers, equipment operators, or motorists.
High-visibility apparel and traffic-control devices should be appropriate for nighttime conditions.
Highway employees may be exposed to significant noise from milling machines, saws, jackhammers, heavy equipment, compactors, trucks, generators, and other machinery.
Noise exposures should be evaluated as appropriate.
Where required, controls may include:
Employees should be instructed in the proper selection, use, and care of required hearing protection.
Road and highway construction may generate dust and airborne contaminants from grading, excavation, demolition, cutting, milling, sweeping, asphalt operations, welding, and other activities.
Hazards should be evaluated and controlled using appropriate engineering controls and work practices.
Where respirators are required, the company’s Respiratory Protection Program should address applicable medical evaluations, fit testing, respirator selection, inspection, maintenance, and employee training.
Highway construction employees may spend long periods working outdoors near hot pavement, asphalt, engines, equipment, and other heat sources.
Heat-stress procedures should address applicable measures such as:
Supervisors and employees should understand the signs and symptoms of heat-related illness and the procedures for obtaining prompt assistance.
Highway operations may also expose employees to cold, wind, rain, lightning, snow, ice, and other severe weather.
Weather conditions can affect employee health as well as traffic, visibility, equipment stability, excavation conditions, and walking-working surfaces.
Work should be evaluated when changing weather conditions create additional hazards.
PPE for highway construction should be selected according to the hazards employees encounter.
Depending on the operation, required PPE may include:
PPE should not be used as a substitute for feasible engineering or work-practice controls when those controls are required.
Road construction employees may use saws, grinders, drills, jackhammers, pneumatic tools, hydraulic tools, compactors, and other portable equipment.
Tools should be:
Employees should be trained to recognize hazards associated with cutting, flying particles, noise, dust, electricity, vibration, pressure, and moving components.
Highway and bridge construction may involve welding, cutting, brazing, torch work, and other hot-work activities.
Applicable procedures should address:
Additional controls may be required when hot work is performed in confined spaces or near traffic, fuel, coatings, or other hazardous materials.
Highway construction may involve temporary electrical installations, generators, extension cords, portable tools, lighting systems, pumps, and other electrical equipment.
Electrical procedures should address applicable requirements for:
Only appropriately qualified employees should perform work requiring electrical qualification.
Cranes, dump trucks, excavators, paving equipment, aerial lifts, and other equipment may operate near overhead electrical lines.
Power-line hazards should be identified before equipment is positioned or operated.
Required clearances and protective measures should be established, and employees should treat overhead lines as energized unless their status has been appropriately verified.
Highway contractors routinely receive and move pipe, barriers, signs, equipment, steel, lumber, concrete products, tools, and other materials.
Loading and unloading procedures should address:
Employees should remain clear of loads that could shift, roll, swing, or fall.
Highway contractors may operate pickups, service trucks, dump trucks, tractor-trailers, water trucks, and other vehicles.
Driving procedures may address:
Particular attention should be given to vehicles entering and leaving active work zones.
Emergency planning should consider the challenges created by highway and road construction locations.
Plans should address as applicable:
Employees should understand how to summon assistance and communicate their location, particularly on projects extending over long distances.
A Job Safety Analysis (JSA/JHA) can help highway contractors identify hazards and establish controls before work begins.
Highway-construction JSAs may address:
The JSA should reflect the actual task, equipment, traffic conditions, work location, and hazards rather than being treated as a generic checklist.
Not every highway contractor requires the same safety programs.
Depending on the company’s operations, additional programs may include:
Programs should be selected because they reasonably apply to the company’s employees, projects, equipment, materials, and workplace exposures—not simply because they could conceivably occur somewhere in highway construction.
Heavy highway contractors may perform a broader range of civil construction than paving contractors alone.
Operations may include:
A Heavy Highway Construction Safety Manual should therefore be assembled according to the contractor’s actual operations rather than relying on a generic road-construction program.
Highway projects frequently involve multiple contractors, subcontractors, inspectors, utility companies, delivery drivers, public agencies, and members of the public.
Safety planning should address coordination of hazards that could affect other employers or workers.
Where the public could be exposed to construction hazards, appropriate controls may include:
Changes that could affect other contractors or the public should be communicated as appropriate.
Toolbox talks can reinforce safe work practices and address hazards relevant to current highway operations.
Useful topics may include:
Toolbox talks supplement required safety training but do not replace training specifically required by applicable OSHA standards.
A Highway Construction Safety Manual establishes the company’s overall safety policies, programs, and procedures.
A Site-Specific Safety Plan (SSSP) applies those requirements to a particular highway or road construction project.
For example, the company manual may contain Traffic Control, Heavy Equipment, Excavation, Silica, PPE, Asphalt, Crane, and Emergency Action procedures. The SSSP can then address the project’s actual traffic configuration, equipment routes, excavations, utilities, emergency access, staging areas, subcontractors, and other site-specific conditions.
The company safety manual therefore provides the foundation for project-specific highway construction planning.
A practical Highway Construction Safety Manual should reflect the operations the company’s employees actually perform.
When determining which programs to include, consider:
Selecting programs according to actual operations produces a safety manual that addresses the contractor’s real hazards without filling the manual with unrelated safety programs.
Highway and road construction contractors can request a customized Construction Safety Manual containing the Core Safety Programs and additional programs applicable to their paving, grading, excavation, bridge, drainage, traffic-control, heavy-equipment, and other operations.
Programs can be selected according to the company’s actual work so the manual addresses relevant highway construction hazards without including large numbers of unrelated safety programs.
Individual safety programs can also be selected when a contractor needs to add or update a particular program within an existing manual.