A Communication Tower Safety Manual provides the written safety policies, programs, responsibilities, and procedures needed to protect employees performing communication tower construction, erection, modification, installation, inspection, maintenance, repair, and related work.
Communication tower work can expose employees to extreme-height fall hazards, structural instability, falling objects, hoisting and rigging hazards, electrical energy, radiofrequency (RF) exposure, severe weather, and difficult emergency-rescue conditions. Tower projects may also involve cranes, gin poles, hoists, antennas, transmission equipment, welding, material handling, and multiple contractors working together at the same site.
An effective Communication Tower Safety Manual should combine the company’s Core Construction Safety Programs with specialized programs and procedures selected according to the tower structures, equipment, work activities, and hazards employees encounter.
The contents of a Communication Tower Safety Manual should reflect the company’s actual tower operations.
A contractor installing antennas on an existing monopole may have different hazards than a company erecting a new guyed tower, reinforcing an existing structure, replacing tower sections, operating a gin pole, or dismantling a communication tower.
The manual should begin with the company’s Core Construction Safety Programs and then include additional programs applicable to the contractor’s tower construction, climbing, hoisting, rigging, RF, and other specialized operations.
A comprehensive Communication Tower Safety Manual may include core programs addressing:
The manual should also establish responsibilities for management, supervisors, employees, competent and qualified persons, hazard identification, inspections, safety training, hazard correction, incident reporting, recordkeeping, and periodic review of the company’s safety programs.
Communication tower construction and maintenance are specialized operations requiring careful planning and coordination.
Before tower work begins, contractors should evaluate:
Conditions should be reassessed whenever the work, equipment, structure, weather, or site conditions change.
A Job Safety Analysis or Job Hazard Analysis should be completed or reviewed before communication tower work begins.
The JSA/JHA may address:
Employees should understand the work sequence, hazards, controls, communication methods, and emergency procedures before beginning the task.
The tower site should be evaluated before work begins.
The assessment may consider:
Hazards identified during the assessment should be incorporated into work planning.
Only employees who are appropriately trained, authorized, and physically capable of performing assigned tower work should climb communication towers.
Climbers should inspect required equipment before use and understand:
Free climbing should not be permitted where fall protection is required.
Tower work should be planned to maintain continuous fall protection wherever employees are exposed to applicable fall hazards.
Methods may include:
Employees should understand how to transition between systems and anchorages without unnecessarily exposing themselves to an unprotected fall.
Personal fall-arrest equipment should be selected and used according to applicable requirements, manufacturer instructions, and the conditions of the work.
Systems may include:
Fall-clearance requirements, swing-fall hazards, anchorage location, and rescue should be considered when selecting the system.
Work-positioning systems may be used to support employees while they perform tasks on tower structures.
Positioning equipment should be appropriately selected, inspected, and attached.
Employees should understand that work positioning and fall arrest serve different purposes and should use the fall-protection systems required for the exposure involved.
Communication towers may contain fixed ladders, step bolts, climbing pegs, cable systems, rails, or other climbing facilities.
Before use, employees should evaluate climbing facilities for:
Damaged or questionable climbing facilities should not be relied upon until appropriately evaluated.
Fall-protection equipment should be inspected as required before use.
Employees should look for:
Equipment involved in a fall or otherwise rendered unsafe should be removed from service.
Access to communication towers should be controlled to prevent unauthorized climbing and exposure to tower hazards.
Employees should use designated access methods whenever available.
Tower access planning should also consider:
Tower rescue requires specialized planning because an injured or incapacitated worker may be hundreds of feet above ground.
Emergency procedures should address:
Employees should know how to initiate a rescue without creating additional victims.
A rescue plan should be developed before employees are exposed to tower fall hazards.
Planning should consider:
Rescue planning should reflect the actual structure and work rather than relying solely on a generic emergency plan.
Tower erection can involve assembling and raising tower sections, structural members, antennas, platforms, mounts, and other components.
Planning should address:
Tower sections should not be loaded or used in a manner inconsistent with the planned erection sequence.
Structural stability should be evaluated throughout erection, modification, reinforcement, repair, and dismantling.
Factors may include:
Work should stop if conditions indicate that tower stability may be compromised.
Existing towers may be modified to accommodate new antennas, equipment, loading, or structural requirements.
Modification work should be performed according to approved plans and procedures.
Employees should not remove, cut, loosen, or alter structural members without determining how the change could affect tower stability.
Temporary bracing or other controls should be installed where required before structural members are modified.
Tower work can temporarily change the forces placed on a structure.
Planning should consider:
Loads should remain within applicable structural and equipment limitations.
Temporary guying or bracing may be necessary during tower erection, modification, repair, or dismantling.
Temporary systems should be installed according to the planned work sequence and maintained until the structure is capable of safely supporting the intended loads.
Employees should not remove temporary supports prematurely.
Tower dismantling can be particularly hazardous because removal of components changes structural loading and stability.
Planning should address:
Components should be removed in a controlled sequence that maintains structural stability.
Gin poles may be used to raise and lower tower sections, antennas, equipment, and structural components.
Gin-pole operations should address:
Gin poles and associated rigging should be inspected and used according to applicable requirements, engineering information, and manufacturer instructions.
Materials may be raised or lowered using hoists, cranes, gin poles, ropes, blocks, or other systems.
Hoisting procedures should address:
Employees should avoid standing beneath suspended loads.
Where employees are hoisted, the operation requires additional planning and controls.
Procedures should address applicable requirements for:
Personnel should not be hoisted using systems or methods that are not appropriate for personnel lifting.
Base-mounted drum hoists may be used during tower construction and maintenance.
Procedures should address:
The hoist should be positioned and operated so the operator can safely control the lift.
Capstan hoists may be used to raise tools, materials, antennas, and other equipment.
Employees operating capstan systems should understand:
Hands, clothing, and body parts should be kept clear of pinch points and moving rope.
Rigging used during tower work may include:
Rigging should be selected according to the load and inspected before use as required.
Damaged or defective rigging should be removed from service.
Wire rope and rigging equipment should be evaluated for wear, damage, deformation, corrosion, broken wires, damaged fittings, and other conditions that could affect safe operation.
Employees should understand equipment limitations and should not exceed rated capacities.
Significant tower lifts should be planned before hoisting begins.
Planning may include:
The plan should be reviewed with employees participating in the lift.
Clear communication is essential during tower hoisting.
Workers should establish:
If communication is lost during a critical lift, movement should stop until communication is restored.
Tower work may involve antennas, microwave dishes, transmission lines, mounts, radios, and other communications equipment.
Installation planning should consider:
Large antennas can create substantial wind loads and should be handled accordingly.
Tower employees may work near antennas and other equipment capable of producing radiofrequency energy.
Before work begins, contractors should determine whether employees could enter areas with potentially hazardous RF exposure.
Controls may include:
Employees should not assume that an antenna is inactive simply because it is not visibly operating.
Work around transmitting equipment should be coordinated with the tower owner, carrier, or other responsible party.
Procedures should establish how transmitter status will be verified and how employees will be protected from RF and electrical hazards.
Where shutdown or power reduction is necessary, communication should be maintained so equipment is not returned to service unexpectedly.
Communication tower sites may contain:
Electrical hazards should be identified and controlled before employees begin work.
Only appropriately qualified employees should perform work requiring specialized electrical knowledge.
Tower sites may be located near overhead electrical lines.
Cranes, gin poles, boom trucks, equipment, tower sections, antennas, and other conductive materials can create electrical-contact hazards.
Applicable clearances and protective procedures should be established before equipment or materials are positioned near power lines.
Hazardous-energy control may be necessary when employees service electrical, mechanical, transmission, or other equipment where unexpected energization could cause injury.
Applicable procedures should identify energy sources and establish appropriate isolation, verification, and control measures.
Employees working on towers may be positioned directly above ground crews or other climbers.
Dropped tools, hardware, antennas, structural components, and other materials can cause serious injuries.
Controls may include:
Loose materials should be controlled before climbing or hoisting begins.
Ground crews should remain outside designated drop zones unless their work requires entry and appropriate controls are in place.
Ground personnel should understand:
The area beneath active tower work should be controlled to prevent unnecessary exposure.
Communication tower projects may use cranes, boom trucks, aerial lifts, and similar equipment.
Procedures should address:
Equipment should be operated within manufacturer limitations and applicable requirements.
Tower workers may use drills, grinders, impact tools, saws, hydraulic tools, torque equipment, and other hand and power tools.
Tools should be:
Employees should use PPE appropriate to the tool and operation.
Tower erection and modification may involve welding, cutting, grinding, or other hot work.
Procedures should address:
Hot work performed at height should consider hazards to employees and property below.
PPE should be selected according to tower tasks and hazards.
Depending on the work, PPE may include:
Employees should inspect required PPE and remove defective equipment from service.
Weather can dramatically increase communication tower hazards.
Conditions should be monitored before and during tower work.
Particular attention should be given to:
Work should be suspended when weather creates unacceptable climbing, hoisting, structural, electrical, or rescue hazards.
Wind can affect climbers, suspended loads, antennas, gin poles, cranes, hoists, and tower stability.
Large antennas and panels can create significant wind resistance.
Wind conditions should be evaluated against the limitations of the structure, equipment, lift plan, and work being performed.
Communication towers can be particularly hazardous during thunderstorms.
Employees should not remain exposed on towers when lightning or electrical storms create an unacceptable hazard.
Weather should be monitored so employees have sufficient time to descend and reach an appropriate location.
Tower climbing and elevated work can be physically demanding, particularly during hot weather.
Heat-stress procedures should address:
Climbing effort and PPE should be considered when evaluating heat exposure.
Tower workers may be exposed to low temperatures, wind, ice, and snow.
Cold can reduce dexterity, affect climbing surfaces, impair equipment, and increase fatigue.
Procedures should address appropriate clothing, warming opportunities, weather monitoring, and recognition of cold-related illness.
Tower work requires concentration, physical exertion, and continuous attention to fall protection and changing conditions.
Fatigue can be affected by:
Work should be planned so fatigue does not unnecessarily increase the risk of climbing, rigging, driving, or other high-hazard operations.
Communication towers may be located in remote or isolated areas.
Procedures should address:
High-hazard tower climbing should not be treated as ordinary lone work when immediate assistance or rescue capability is necessary.
Tower crews may travel significant distances between jobsites while transporting tools, rigging, antennas, trailers, and other equipment.
Procedures may address:
Equipment and materials should be secured for transportation.
Tower sites should be controlled to prevent unauthorized persons from entering hazardous work areas.
Controls may include:
Public protection is particularly important when towers are located near roads, businesses, residences, or other occupied areas.
Tower employees should receive training appropriate to their assigned work and hazards.
Training may include:
Specialized training should be provided when employees perform tasks requiring competent-person, qualified-person, operator, rigger, signal-person, rescue, or other specific capabilities.
Tower-specific JSAs may address:
The JSA should reflect the actual tower, equipment, personnel, weather, work sequence, and site conditions involved.
Not every communication tower contractor requires every safety program.
Depending on the company’s operations, additional programs may include:
Programs should be selected according to the contractor’s actual tower work, structures, equipment, and employee exposures.
Communication tower contractors may perform work for tower owners, wireless carriers, telecommunications companies, construction-management companies, general contractors, and other clients.
Customer requirements may address:
Applicable tower-owner, carrier, or prime-contractor requirements should be incorporated into project planning and followed in addition to the contractor’s own safety procedures.
Communication tower projects may involve tower owners, wireless carriers, construction managers, general contractors, crane companies, electrical contractors, tower crews, and other subcontractors.
Coordination should address:
Each employer remains responsible for protecting its employees while coordinating hazards that may affect workers employed by others.
Toolbox talks can reinforce hazards relevant to current tower operations.
Useful topics may include:
Toolbox talks supplement required safety training but do not replace training specifically required for assigned work.
A Communication Tower Safety Manual establishes the company’s overall written safety policies, programs, and procedures.
A Site-Specific Safety Plan (SSSP) applies applicable requirements to a particular tower project or location.
For example, the company manual may contain Fall Protection, Tower Rescue, Rigging, Hoisting, RF, Electrical Safety, Crane Safety, and other programs. Project-specific planning can then address the actual tower configuration, climbing system, antennas, RF sources, structural work, lift equipment, weather, access, customer requirements, and emergency arrangements.
The company safety manual therefore provides the foundation for site-specific communication tower safety planning.
A practical Communication Tower Safety Manual should reflect the tower operations the company actually performs.
When determining which programs to include, consider:
Selecting programs according to actual operations produces a safety manual that addresses the contractor’s real hazards without filling the document with unrelated safety programs.
Communication tower contractors can request a customized Construction Safety Manual containing the Core Safety Programs and additional programs applicable to their tower climbing, fall protection, rescue, erection, structural, rigging, hoisting, RF, and other operations.
Programs can be selected according to the company’s actual tower work, equipment, and hazards so the manual addresses relevant operations without including large numbers of unrelated safety programs.
Individual safety programs can also be selected when a communication tower contractor needs to add or update a particular program within an existing manual.